Home Enterprises Mail Contact Us 中文版
 
 

Project

Scope of works

Scale

Client

Status

Gas gathering station

 

 

 

 

Gas distribution & metering of 2# & 3# stations for Hutubi gas storage in Xinjiang

Design & supply of skid-mounted equipment

Capacity of gas injection: 736(400) × 104 Nm3/d;

Capacity of gas production: 1,068(576) × 104 Nm3/d

CNPC

Good operation

HP wet gas reinjection distribution station of Zahnanor Oilfield in Kazakhstan

Design & supply of gas injection skid, gas distribution skid and control room skid

Capacity of each branch of the reinjection well: 17,000 to 34,000 Nm3/h

CNPC

Good operation

Control system of gas injection station at 3# man-made island of CNPC Nanpu Oilfield

Design & supply of gas distribution skid

Capacity of single-well gas injection: 0.5 × 104 Nm3/d to 2 × 104 Nm3/d

CNPC

Good operation

Development engineering of Daniudi gas field

Design of modular 54# gas gathering station

Capacity: 80 × 104 Nm3/d

Sinopec

Good operation

Wellhead integrated skid

 

 

 

 

Pilot production development engineering of Longwangmiao gas reservoir in Anyue gas field

Design & supply of wellhead integrated skid

Capacity: 20 × 104 Nm3/d & 100 × 104 Nm3/d

CNPC

Good operation

Skid-mounted equipment of Dagang Oilfield in Tianjin

Design & supply of wellhead integrated skid

Capacity: 10 × 104 Nm3/d

CNPC

Good operation

Chongqing Yun’an wellhead skid-mounted equipment

Design & supply of wellhead integrated skid

Capacity: 30 × 104 Nm3/d

CNPC

Good operation

Gas gathering engineering of Gaoshi-6 well in Shu’nan gas field

Design & supply of wellhead integrated skid

Capacity: 20 × 104 Nm3/d &100×104 Nm3/d

CNPC

Good operation

 
Home  About Us  News  Services  Solutions  Projects  Contact Us
©2012- Sichuan CORBIC Oil and Gas Engineering Co., Ltd.